Tuolumne County Building and Safety Division
Inspections and Results
 
Permit No. B2018-00301 Permit Type   NEW SFD Site Address   17211 TIMBER DR.
Applied   03/23/2018 Applicant   WELLER, ROBERT
Approved   06/19/2018 Owner   WELLER, ROBERT
Issued   06/19/2018 Contractor   WELLER CONSTRUCTION COM.
Parent Permit No.   Description   NEW SFD
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

 06/21/2018UNDERGRD PLBGRick BarrieauAPPROVEDsoulsbyville(6/21/2018 1:20 PM RB) Viewed compaction report for 2 ft of fill at porch. Explained erosion control requirements.

 07/18/2018FOUNDATIONDan CoughlinAPPROVEDFtgs & slab & Ufer

 08/09/2018UNDERGRD ELECT.John SnellingAPPROVED(8/9/2018 11:01 AM JS) From power pole to building pad

 08/09/2018TEMP POWERJohn SnellingAPPROVED

 07/10/2019FRAMEDan CoughlinCORRECTIONS(7/10/2019 11:37 AM DANC) 1. Have DWV under water test through roof. 2. Have Engineer and County approve revised floor framing plan and floor truss calculations. 3. No unions allowed in gas line in conceled spaces (two in master bath wall/ceiling). 4. Stair nosings required by final: minimum 3/4 inch, maximum 1 and 1/4 inch. 5. Insulate hot water lines to kitchen and 3/4 inch or larger.

 12/19/2018ROOF NAILDan CoughlinCANCELLEDNOT READY

 01/03/2019ROOF SHEATHINGDan CoughlinAPPROVEDSee attached engineer letter

 01/24/2019SHEAR/BRACINGDan CoughlinCORRECTIONS(1/24/2019 11:46 AM DANC) 1. Engineer to detail fix for omission of twist straps per detail 8/S3.1. 2. Engineer to detail fix for electric panel penetration of type C shear wall. 3. Engineer to detail fix for 9 foot shearwall (type C) vs. 10 foot per plan. 4. Engineer to address penetration of 14 foot type A shear wall at east side with doorway. 5. Hold down bolts do not count as anchor bolts: add anchor bolts throughout as needed. 6. Complete vertical edge nailing at shear wall ends as needed.

 02/15/2019REINSPECTIONDan CoughlinAPPROVEDShear, Nail

 07/08/2019FRAMEDan CoughlinCANCELLEDNot Ready

 07/18/2019REINSPECTIONDan CoughlinAPPROVEDPlumbing

 07/26/2019INSULATION WALLSKatelyn OgburnAPPROVED(7/26/2019 3:00 PM KO) Please confirm QII inspection results. Send to Katelyn at kogburn@co.tuolumne.ca.us and Dan Coughlin. Insulation OK upon receipt of successful QII inspection report. (7/30/2019 7:36 AM KO) Recieved QII information via email and verified on CalCerts that QII has been completed.

 08/20/2019SHEETROCK NAILDan CoughlinCORRECTIONS(8/20/2019 2:09 PM DANC) 1. Maintain 6 foot 8 inch head clearance at stairs.

 01/23/2020FINALDan CoughlinCORRECTIONSrolled, left msg 694-6121(1/23/2020 11:04 AM DANC) 1. Paint/protect PVC at exterior. 2. Remove shutoff valve at fire sprinkler riser. Tie domestic and fire water together at shutoff valve near gravity feed from tank and install permanent sign per CRC R313.3.7. 3. Install GFCI at laundry outlet within 6 foot of sink. 4. Complete "Building Maintenance and Operations" manual. 5. Final well and grading permits.

 02/06/2020REINSPECTIONDan CoughlinCANCELLED& Final(2/6/2020 7:57 AM DANC) Need E.H. well final okay.

 02/14/2020REINSPECTIONDan CoughlinCANCELLEDR & Final (see notes)(2/13/2020 9:20 AM SRP) 694-6121 VM full, unable to leave msg (2/14/2020 12:57 PM DANC) Locked gate: no access.

 02/20/2020FINALDan CoughlinAPPROVED& Final