Date of Inspection
|
Inspection Type
|
Inspector
|
Result
|
|
Notes
|
|
06/23/2021 | FINAL | Rick Barrieau | CORRECTIONS | PM | (6/23/2021 4:49 PM RB)
1) Gas line needs to complete and have pressure of 10 psi and hold for 15 minutes.
2) Wiring is not complete in the ATS.
Grounds and nuetrals not connected.
3) The lever disconnect for the ATS is mounted too high, the max height to the center of the switch is 6 foot 7 inches.
If you are not ready for inspection, DO NOT CALL FOR ONE. |
|
06/24/2021 | FINAL | Rick Barrieau | CORRECTIONS | PM | (6/24/2021 3:12 PM RB)
1) The main disconnect on the ATS is too high for code. A max of 6ft 7 inches is allowed, measured to the center of the switch.
2) Phase tape condutors properly.
3) Support gas line where it enters the underfloor space.
A re-inspection fee is due before next inspection. |
|
01/14/2022 | FINAL | Dan Coughlin | APPROVED | | |
|
|
|
|